EN
Sign inTry for free

Production date · expiration date · permit documents · emission type · batch

Code information correction: fix the whole order at once

Wrong production or expiration date, the wrong permit document, the wrong emission type — you don’t need to reorder codes. Enter the order number, choose what to fix, check “Current” and “Will be” and sign. The “Correction of code information” document goes to Chestny ZNAK with all eligible codes of the order.

  • By order number
  • More than 30,000 codes go out as several documents in a row
  • Result for each GTIN
  • On any plan, including Mini

what it fixes

Five types of code information — in one document

What you can change depends on the product group and on what has already happened to the codes. A field that is unavailable for the order is shown in gray, with the reason

Production date

Applied codes and codes in circulation, including those packed into packages

If the date was already submitted with code application or introduction into circulation

Expiration date

Applied codes and codes in circulation, including those packed into packages

In product groups where Chestny ZNAK accepts an expiration date: dairy products, water, beer, grocery products, canned food, animal feed and others

Permit documents

Applied codes and codes in circulation, including those packed into packages

Replace all permit document data or add to the existing data. Not for veterinary drugs and dietary supplements

Emission type

Received and applied codes, while they are not yet in circulation or packed into a package

Production in Russia changes to import into Russia and back, for the whole order. Not for beer, confectionery, fur, radio electronics, laptops and smartphones, re-marking or stock marking

Batch number

Applied codes, while they are not yet in circulation or packed into a package

Dairy products: the account reserves the batch number in the batch register before signing

It does not fix the HS code, weight or the veterinary accompanying document (VSD). The codes themselves stay the same

chestny znak account and truemark

Same document. No need to collect codes

In both cases the “Correction of code information” document goes to Chestny ZNAK. The difference is how much work it takes before signing

In the Chestny ZNAK account

  1. “Documents” → “Create” → “Correction of code information”
  2. Choose the type of information
  3. Build the list of codes: pick them from a list or upload an Excel file of up to 10 MB
  4. If the document is processed with errors, look for the reason in the document’s error report

In Truemark

  1. Enter the order number: the account finds all codes of the order and shows their status
  2. Choose one or several fields and check “Current” and “Will be” before signing
  3. Codes of group packages, sets and ineligible codes don’t go into the document, so it isn’t rejected as a whole
  4. More than 30,000 codes: the account splits the order into documents and signs them in a row, the result is shown for each GTIN

The Chestny ZNAK account is described from its guide to correcting code information on markirovka.ru, checked on November 25, 2026.

in Truemark

How to correct information in four steps

Step by step, with account screens and rejection reasons, in the knowledge base guide

  1. 1

    Order number

    In “Tools” → “Data correction”, enter the order ID. The account shows the order card: product group, emission type, GTINs and how many codes are applied and in circulation

    No need to collect codes
  2. 2

    What to change

    Choose the fields and type the new value in “Will be”. One value for all codes of the order, or a separate one for each GTIN in the extended form

    The draft is saved
  3. 3

    Sign and send

    The document is signed with the certificate you signed in with. If there are more than 30,000 codes, the account splits them into several documents and signs them in a row

    One click
  4. 4

    Result

    The status updates by itself and you get a notification with the result. For each GTIN you see how many codes were accepted and rejected, and “Repeat” creates a draft with the same values

    Accepted, partially, rejected

where in the account

Correction right where the error was found

Open it from the menu, from the code application report and from the review of a rejected introduction into circulation

  • “Tools” in the menuThe “Data correction” card: the list of corrections, drafts and a new correction
  • “Fix dates” in the code application reportGot the production or expiration date wrong? The button in the report header opens a correction for this order
  • A hint when introduction into circulation is rejectedFor error 48 about the introduction method and error 212 about the expiration date and VSD, the account suggests what to fix with a correction

Any plan

Mini, Opti, Maxi and the 7-day demo

Without a plan

With the “Stock marking” or “Re-marking” module, for that module’s orders

Four languages

Russian, English, Vietnamese and Chinese, for employees and suppliers

All plans

frequently asked questions

Data correction: the essentials

Didn’t find an answer? An expert replies in the account chat in 15 minutes on average. Step by step in the instructions, error codes in the error decoder.

Can the expiration date be corrected after introduction into circulation?

Yes. The production date, expiration date and permit documents can be changed both for applied codes and for codes in circulation, including those packed into packages. The emission type and batch number can only be changed while the codes are not yet in circulation.

How do I change the production date in Chestny ZNAK?

With the “Correction of code information” document. In Truemark, open “Tools” → “Data correction”, enter the order ID, choose “Production date” and type the new date. You can correct a date that was already submitted with code application or introduction into circulation.

How do I change the emission type in Chestny ZNAK?

With a data correction, while the codes are not in circulation and not packed into a package. Production in Russia changes to import into Russia and back, for the whole order at once. For beer, confectionery, fur, radio electronics, laptops and smartphones, and for re-marking and stock marking orders, the emission type cannot be changed.

Do I need to reorder codes?

No. The code information in Chestny ZNAK changes, while the codes and labels stay the same.

Can I fix one code instead of the whole order?

Corrections are made by order: all eligible codes get the new value. In the extended form you can set a separate value for each GTIN or leave some products unchanged.

What do I do about error 212 “The expiration date does not match the VSD”?

Check that the document has the VSD of this very batch. If the VSD is correct, correct the codes’ expiration date with a data correction and repeat the introduction into circulation.

Can I cancel a correction that has been sent?

No. Only a draft can be deleted. If you sent a wrong value, wait for the Chestny ZNAK response and make a new correction with the right one.

Which Truemark plan includes data correction?

Any of them: Mini, Opti, Maxi and the demo. Without a plan, with the “Stock marking” or “Re-marking” module, for that module’s orders.

An error in code information is no reason to reorder codes

Data correction is available on any Truemark plan. 7 days of full access for free.

See also: step-by-step guide · Chestny ZNAK error decoder · expiration date and batch number in the code application report · permit documentation

Need help with marking?

An expert replies in English in the account chat in 15 minutes on average, 7 days a week. 7 days of full access for free, no card required.